|
Example comparison of the metric levels of first three measures:
-3 | * * * * -2 | * * * * * * -1 | * * -3 | * * * * -2 | * * * * * * 0 | * * 1 | * * * -2 | * * * * * * 1 | * * * -3 | * * * * -2 | * * * * * * -1 | * * -3 | * * * * -2 | * * * * * * 0 | * * 1 | * * * -2 | * * * * * * --------------------------------------------------- -2 1 0 -2 -3 -1 -2 -3 1 -2 1 0 -2 -3 -1 -2 -3 |
Here is a graphical version of the previous figure:
|
Here is the same graph with the events weighted (linearly) by their durations: |
Here is a plot with the three colors separated: red = pitch, green = duration, and blue = metric level.
The same musical selection not weighted by duration:
Full musical example with separated colors:
Here is a plot where only the white portions of the plot are displayed (where all three components match exactly). Good for detecting regions of exact repetition.
Pitch class:
|
Intervals:
|
Scale Degrees: (not done yet)
listen to the two pieces being compared:
sioux125b.mid |
-r | = | repeat the pixels to increase the size of the output plot |
-a | = | display composite plot plus separate plots for each of the analyses: pitch, duration and metric level. |
-w | = | display only the white portions of the plots |
-f | = | flip the vertical axis of plots |
-d | = | print humdrum data analysis output |
-e | = | display events with equal area regareless of duration |
-i | = | use intervals instead of absolute pitch |
-p | = | use pitch class instead of absolute pitch |
-R | = | do not print pitch analysis on composite graphs |
-G | = | do not print duration analysis on composite graphs |
-B | = | do not print metric level analysis on composite graphs |